#105 Split Rail System for Undercar Wheelset Change-out, 40,000 lbs. Capacity
|
Solution No. 105
|
Transportation
|
|||||
| Specifications |
36-400PX |
40,000 lb. capacity |
42 sets of a 3-piece system provided to 3 Amtrak facilities |
|||
|
|
||||||
![]() |
Features |
|||||
|
||||||
| Outline | ||||||
|
The need for safe and efficient undercar wheelset change-out systems was a challenge that Handling Specialty readily satisfied for the maintenance facilities of Amtrak’s northeast corridor project. The split rail system consists of integral support pedestal/split rail assemblies; interlocks to the “blue flag” safety system; undercar lift/eject carriage; and wheelset dollies. Once the wheelset is stationed, the carriage elevates the train for blocking, lowers the wheelset, and rotates 90º to eject the load onto a wheelset dolly. The carriage comes with AC/DC power supplies, ergonomic work platforms, 3-axial motion of the support yoke and remote operator pendant. The top yoke can be interchanged to employ custom tooling for removing large undercar assemblies.
|
|
|||||
| Toll free: 1-800-559-8366 |
Email: info@handling.com |
|||||
|
|
||||||



